The new Costco distribution warehouse comprises a total of 375,000 ft² of floorspace and includes 430 HGV parking spaces and 330 car parking spaces. The site is located at Junction 18 of the M1 Motorway in Crick, Northamptonshire.
Key Information
- Client: Costco Wholesale
- Architect: Broadway Malyan
- Location: Northamptonshire
Project Overview
The new Costco distribution warehouse comprises a total of 375,000 ft² of floorspace and includes 430 HGV parking spaces and 330 car parking spaces. The site is located at Junction 18 of the M1 Motorway in Crick, Northamptonshire.
Brief scope of works
SOCOTEC Building Control Ltd carried out the building control services for Costco’s new distribution depot in Crick, Northampton. Situated in a 60 acre site on Dockham Way in Crick which the depot was constructed to replace Costco’s existing depot in Magna Park. The depot contained a new chilled warehouse, white good warehouse and office space and was completed within a 36 week programme. The building was also designed with an ecommerce section for Costco’s online orders and was designed to facilitate the
future construction of a second phase.
We have a long standing relationship with Costco in providing building regulations approval, with successful completion of new stores at Farnborough, Hayes and Sunbury.